LOCAL COVERAGE / OCTOBER 12WKDZ: More detail on the two proposed Hopkinsville projects

Hopkinsville, Kentucky

Data centers.
Here in Hoptown.

DarkHorse proposes two AI projects in Hopkinsville:

Project Brickyard
Convert our existing Bitcoin operation into an AI inference factory, using 15 MW of total site power.

Project Truckstop
Build a separate 50 MW AI facility.

Compare the projects

AI-generated concepts. Final design and approvals remain pending.

Explore the concepts
COMPANY UPDATE OCTOBER 6Read our October 6 announcement on Project Truckstop and the new HES substation.

01 / The projects

Two sites.
Two different proposals.

Project Brickyard would convert our current 15 MW Bitcoin mining operation into an AI inference factory with 15 MW of total site power. Project Truckstop is a separate proposed 50 MW site.

EXISTING LOCATION01

Project Brickyard

Project Brickyard would convert our current 15 MW Bitcoin mining operation into an AI inference factory. Total site power would remain 15 MW, including computers, cooling and supporting equipment.

15 MWTotal site power
for the proposed AI inference factory
AI conversion under evaluationSee concept
SEPARATE NEW LOCATION02

Project Truckstop

Project Truckstop is a proposed separate Hopkinsville site. A September 30 power agreement sets out service from a new HES substation. Construction and delivery remain conditional.

50 MWMaximum demand in the signed power agreement
for the proposed new site
Design and approvals pendingSee concepts

What does MW mean? A megawatt measures power. It does not tell you a building’s size, water use, noise, or staffing.

Read the October 6 project announcement ↗

02 / The company

Who is
DarkHorse?

DarkHorse Technologies Inc. is a Nasdaq-listed company (DRK) that operates power and data center sites. We are studying AI uses for selected sites, including Hopkinsville. We want neighbors to know who is responsible for the work.

ABOUT THREE YEARS

Operating in Hopkinsville

Our Bitcoin site has operated here for about three years. Project Brickyard is the proposed AI conversion of that existing site.

JUNE 2026

Two companies combine

Sphere 3D and Cathedra combined. The company brought Cathedra’s power and data center operations into a public company.

SEPTEMBER 2026

The DarkHorse name

The company became DarkHorse Technologies Inc. on September 16. Its shares began trading on Nasdaq as DRK on September 17.

PEOPLE BEHIND THE WORK

Experience in power,
operations and data centers.

DarkHorse leads the projects. EA Advisors supports technical planning. Barge Design Solutions and Empirix Partners bring engineering, program management and procurement experience.

DARKHORSE / PROJECT LEADERSHIP

COMPANY LEADERSHIP

Joel Block

Chief Executive Officer

Leads DarkHorse’s business and operations.

More than 20 years of experience across operations, sales and finance. Previously CFO of US Bitcoin Corp. and CEO of Collegewise.

POWER AND SITE DEVELOPMENT

Tom Masiero

Head of Strategy

Works on power and site development. Your Hopkinsville project contact.

Co-founder and former COO of Great American Mining, acquired by Crusoe Energy in 2022. His background includes developing and operating energy-linked computing infrastructure.

EA ADVISORS / TECHNICAL AND OPERATING ADVISORS

Experience that supports the work.

Engaged in June 2026 to support the company’s AI and high-performance computing projects.

DATA CENTER ARCHITECTURE

Michael Sweeney

EA Advisors

Experience in data center architecture, power, cooling and modular infrastructure.

Prior senior architecture roles at Microsoft, Salesforce, Oracle and Silent-Aire. Earlier modular data center engineering work at Dell and IO.

DESIGN AND CRITICAL POWER

Alexis Stobbe

Founder & Managing Partner, EA Advisors

Experience across data center design, electrical infrastructure and commercial planning.

Prior leadership at Jacobs and Anord Mardix, with earlier commercial leadership at Compass Datacenters.

DATA CENTER OPERATIONS

Jason Okroy

EA Advisors

Experience building and leading teams that support data center operations.

Co-founded Salute Mission Critical and served as CEO through its international expansion, serving large cloud, colocation and edge operators.

Companies named above describe prior experience. They are not presented as current partners in the Hopkinsville projects.

TECHNICAL PARTNERS / THE DEVELOPMENT PROGRAM

Engineering and project delivery.

Barge Design Solutions and Empirix Partners support DarkHorse’s TVA-region program. We announced these relationships on September 23, 2026.

ARCHITECTURE AND ENGINEERING

Barge Design Solutions

Design partner

Provides architectural and engineering design. Its surveying, environmental and engineering services connect site conditions with facility plans.

Founded in 1955, Barge is employee-owned. Our September 23 announcement describes more than 650 professionals across the Southeast. Barge reports over 7.5 GW of data center master-planning experience.

PROGRAM MANAGEMENT AND PROCUREMENT

Empirix Partners

Owner’s representative

Represents DarkHorse in program coordination and procurement planning. It coordinates engineering, suppliers, equipment lead times and development schedules.

Empirix specializes in sourcing and procurement for critical infrastructure. CEO Zachary Peña previously built procurement programs at NTT, Microsoft and Insight Sourcing Group.

What would the computers do?

The proposed AI facilities would house computers that run software, including AI services. Power, cooling and network connections support that work. AI computing differs from Bitcoin mining. Neither proposal is a completed AI facility.

03 / AI work

Training builds a model.
Inference uses it.

At the September 28 hearing, Tom explained the distinction. Our intended AI direction includes inference, but we have not announced a tenant or final workload.

TRAINING

Build a model

Training teaches an AI model from data. The largest models can need large computer clusters for long runs. Those campuses are one type of data center.

INFERENCE

Use a trained model

Inference runs a trained model to answer a question or complete a task, such as translation. Our proposed AI facilities could support this kind of work.

04 / Water

Clear answers about water.

Residents have asked whether the projects will use city water for cooling, discharge cooling fluid, or harm local water. Here are our commitments and the public evidence.

CITY WATER FOR COOLING

Will cooling use city water?

No. Neither Project Brickyard nor Project Truckstop will use municipal water for cooling. Both will use closed-loop cooling with dry heat rejection.

COOLING FLUID DISCHARGE

Will cooling fluid reach the sewer or waterways?

No routine discharge. Cooling fluid will recirculate in a closed system. Maintenance fluid will be captured and removed from the site, not released to the sanitary sewer or local waterways.

LOCAL TESTING

What has local testing found?

HWEA reported no harm. At the August 20 City meeting, HWEA General Manager Melissa Spurr said recent testing found no harm from the existing data center. The published minutes do not include the lab results. DarkHorse supports more testing.

WHAT STILL NEEDS REVIEW

Building water and fire protection.

Restrooms, sinks, sanitary service, and fire protection are separate from cooling. HWEA asked to review water demand, wastewater, fire flow, and required infrastructure before committing capacity.

The proposed ordinance requires closed-loop cooling. Our commitment is more specific: no municipal water for cooling.

SEE HOW IT WORKS

Closed-loop cooling in Quincy, Washington

NBC Montana shows how closed-loop cooling works at a Quincy data center. Robert Morris also describes how quiet the outdoor chillers were during his visit.

Cooling excerpt: 2:50–3:40 of the original report. Source: NBC Montana, Laurel Staples.

05 / Power and the grid

Where does
our power come from?

HES delivers electricity from the Tennessee Valley Authority, better known as TVA. We have participated in TVA’s demand-response program since 2023.

PUBLIC POWER / LOCAL DELIVERY

What makes TVA different?

Congress created TVA in 1933 to expand electricity access and economic opportunity. Today, America’s largest public power provider serves more than 10 million people across seven states.

TVA is federally owned and pays no shareholder dividends. Electricity sales fund its operations. Its mission includes affordable power, economic development and management of the Tennessee River.

TVA supplies regional power. HES delivers that electricity to homes and businesses here in Hopkinsville.

TVA ELECTRICITY SUPPLY / FY2025

A mix of power sources

TVA generates electricity and purchases additional supply.

Natural gas
34%
Nuclear
33%
Coal
19%
Hydroelectric
10%
Other renewables
4%

Regional annual supply, including purchased power. These shares describe electricity supplied, not spare capacity. The mix changes over time.

OUR PARTICIPATION

Since 2023

Part of TVA’s
demand-response program.

Demand response means reducing electricity use when the grid needs relief. This reduction is called curtailment.

A flexible facility can lower its demand during periods of grid stress. This helps TVA manage peak demand and avoid expensive power purchases.

A RESULT ACROSS TVA’S SYSTEM

1,300 MW

Demand reduction on January 22, 2025. TVA reports more than $1 million in avoided power purchases that day.

These are TVA-wide results, not our site’s contribution.

RELIABILITY

How is the grid protected?

Large facilities require utility planning, adequate infrastructure and controls on electricity use.

Our signed agreement for Project Truckstop gives HES the right to require reductions in electricity use, including during emergencies.

Curtailment reduces demand when needed. It does not replace the infrastructure and utility review required to serve a project.

COST RESPONSIBILITY

Who pays for added capacity?

TVA has specific rates and capacity charges for data centers. These are designed to recover the cost of serving large electricity users.

The Capacity Commitment Charge, or CCC, addresses additional capacity costs. Curtailment addresses electricity demand during periods of grid stress.

These protections work together. Program participation does not automatically establish an exemption from capacity charges.

06 / For Hopkinsville

What does
Hopkinsville get?

Our existing site buys power from Hopkinsville Electric. A signed agreement calls for a new HES substation of at least 65 MW for Project Truckstop. Our project company must prepay its actual construction costs. New AI facilities could add meaningful local tax revenue when built.

POTENTIAL LOCAL TAX BASE

See where local tax goes

At full modeled value, City property-tax examples are about $1.31 million a year for Brickyard and $4.38 million for Truckstop. They are planning estimates, before depreciation, exemptions and final assessments, not promised annual payments.

See the project tax examples ↗

SIGNED AGREEMENT, WORK PENDING

More capacity, paid for by us

On September 30, our project company and HES signed a 50 MW power agreement. HES would build and own a substation of at least 65 MW. We must prepay its actual costs as HES makes commitments. The agreement assigns that construction cost to us, not other HES ratepayers. HES may use about 15 MW for other customers. Our September 8 estimate of $8 million to $10 million is not a fixed price. Permits and delivery remain open.

Earlier company proposal, September 8 ↗

PRIORITY UNDER DEVELOPMENT

Local work and training

Planning estimates are 7 to 10 full-time Brickyard jobs and 25 to 30 full-time Truckstop jobs, with average annual pay near $100,000 before benefits. Construction jobs are additional. These are not posted or guaranteed roles.

Introduce your business or program ↗

What would make this useful to Hopkinsville?

We welcome conversations with local groups, schools and businesses. Tell us about a local need, a training idea, or an opportunity for your business.

Share an idea

07 / Explore the plans

See what’s
being considered.

Different designs can support AI computing. These concepts help explain building form, equipment areas and landscaping. No option shown here is a final selection.

Project Truckstop conventional concept with labeled office and warehouse, a U.S. flag beside the office, and separate equipment areas.
PROJECT TRUCKSTOPIllustrative concept / October 2026
OPTION 01

A conventional building

A building-based approach with computing equipment inside. The concept shows landscaping and separate areas for cooling, batteries and electrical equipment.

AI-generated illustration. Appearance and equipment placement can change.

Project Truckstop modular concept with labeled office and warehouse, a U.S. flag beside the office, computing units, cooling and electrical areas.
PROJECT TRUCKSTOPIllustrative concept / October 2026
OPTION 02

Grouped modular units

A modular approach groups purpose-built computing units with cooling and power equipment. Foundations, screening and the final site layout require engineering and review.

AI-generated illustration. This is an alternative concept, not an additional project.

Project Brickyard AI conversion concept with labeled equipment, parking, office and warehouse, and a U.S. flag beside the office.
PROJECT BRICKYARDIllustrative concept / October 2026
BITCOIN TO AI INFERENCE

Project Brickyard

Project Brickyard would convert our current 15 MW Bitcoin mining operation into an AI inference factory. Total site power would remain 15 MW.

That includes power for computers, cooling and supporting equipment. Project Truckstop is the separate proposed 50 MW site.

AI-generated illustration. Boundaries, land arrangements and layout require confirmation.

08 / Your questions

Common questions.
Simple answers.

These topics come from public meetings, local coverage and community feedback. We’ll update the answers as the plans develop.

Ask something else

Reviewed October 14, 2026

WATER

No municipal water

Both proposed AI facilities will use closed-loop cooling and dry heat rejection. See the Water section ↗

JOBS

7 to 10 and 25 to 30 jobs

Full-time planning estimates for Brickyard and Truckstop, with average annual pay near $100,000 before benefits.

CITY PROPERTY TAX

$1.31M and $4.38M per year

Full-value City property-tax examples for Brickyard and Truckstop. Illustrative, not promised annual payments.

Are Project Truckstop and Project Brickyard at the same site?

No. Project Truckstop is the proposed 50 MW facility at a separate location. Project Brickyard would convert our current 15 MW Bitcoin mining operation, served by Holland Substation, into an AI inference factory. Its proposed 15 MW of total site power includes computing and facility equipment.

Compare the two projects ↑
What about noise near homes?

Yes, some neighbors hear the Bitcoin site today. Its cooling fans can carry sound beyond the site. Hopkinsville already has a noise ordinance with day and night limits for industrial areas. We comply with the current ordinance and will continue to do so. The ordinance measures sound at the receiving property's boundary. It also prohibits noise disturbances below the numeric limits.

The proposed AI conversion would move heat through a closed liquid loop. It would still need equipment to release that heat, and some equipment may use outdoor fans. We expect a quieter design, but measurements must prove it.

Our proposed plan is an independent sound study with day and night readings at affected property boundaries near homes. We would publish the results, seek written project limits, and correct sound that exceeds those limits. The study, project limits and correction process are proposals, not adopted conditions yet.

Read Hopkinsville's sound limits ↗Read the noise disturbance rule ↗Report a noise concern ↗
Will this increase my electric bill?

HES / AUGUST 20, 2026 PUBLIC MEETING

“Their usage accounts for about 3.1% of our current HES revenues, which help us to avoid a rate increase.”
Jeff Hurd, HES General Manager
Hopkinsville Committee of the Whole

Hurd was discussing the existing Bitcoin mining operation. The city’s approved minutes also record his explanation that the operation helped HES avoid rate increases.

Our existing site buys electricity from HES. Revenue from large customers can help cover shared utility costs when their rates also cover the cost of serving them. This can help limit pressure on other customers’ rates.

TVA sets wholesale power terms. HES sets local customer rates, subject to TVA approval. HES publishes its residential rates.

TVA put separate data center rates into effect on October 1. Its rules also include a capacity commitment charge for certain new load. The charge for our projects has not been confirmed. Our September 30 agreement assigns the new substation’s actual construction cost to our project company. HES must receive our deposits before it makes matching commitments. Future rates also depend on fuel costs, system investment and other factors.

Where our power comes from and how curtailment works ↑How HES rates work ↗How large customers can help cover utility costs ↗
What protects neighbors from the site’s impacts?

We support data centers in industrial zones under clear rules. Our existing Bitcoin site has operated in Hopkinsville for about three years. As we said in July, no documented complaint had been brought directly to us at that time. Residents have since raised noise and water concerns in public. We take those concerns seriously and want measured answers.

Hopkinsville's current noise ordinance applies today, and we comply with it. Final setbacks and buffers for new facilities depend on adopted rules and reviewed plans. The illustrations do not establish those distances. We support measurable standards for noise, water, lighting and cleanup.

Read the current sound limits ↗Follow the planning process through CDS ↗
Will there be jobs and local business opportunities?

Operating estimates: We estimate 7 to 10 full-time jobs for the proposed 15 MW Project Brickyard conversion and 25 to 30 full-time jobs for the proposed 50 MW Project Truckstop facility. Estimated average annual pay is near $100,000 before benefits.

Construction jobs are additional to these full-time operating estimates. These are planning estimates, not posted or guaranteed roles.

Existing Bitcoin site: It operates today. We have no open local roles to announce here.

Project Brickyard: An AI conversion would need design, installation and startup work. We want qualified local electricians, plumbers, HVAC contractors and technicians to bid on work that fits their skills.

Project Truckstop: A separate new facility would need construction work if approved and built. A conventional building could create opportunities for local construction trades. A modular design is also under study. We estimate construction could start in 2027 or 2028, subject to design, permits, utility work and approval. Permanent operating roles would follow. Staffing plans and construction awards are not confirmed.

Email us about local work ↗
How would tax payments and a community fund work?

At full modeled value, annual City property-tax examples are about $1.31 million for Project Brickyard and $4.38 million for Project Truckstop. Total local property-tax examples are about $5.09 million and $16.97 million, respectively, across schools, the City, county and local districts. These examples are before depreciation, exemptions and final assessments. They are not promised annual payments. Explore the tax calculator or compare Other towns.

The City also collects occupational license tax on eligible wages earned in the City and eligible business profits. HES power revenue is separate. Kentucky’s commercial electricity sales tax goes to Kentucky, not the City.

We are open to working with local leaders on a community benefit fund. No fund amount, source or terms have been agreed.

City business tax rules ↗Kentucky property tax rules ↗HES commercial electricity tax explanation ↗
Who pays if the operator leaves?

We support a removal plan and financial security for cleanup. The proposed ordinance includes decommissioning requirements.

A support statement is different from a posted bond or an executed agreement. The final requirements must identify who is responsible, what is secured and how the city can enforce them.

Read the September 21 draft rules (PDF) ↗
Did the September 28 hearing approve the projects?

No. The hearing concerned proposed city zoning rules. Kentucky New Era reported that the Planning Commission returned the draft to Plan Review without a recommendation.

The projects still need design work and relevant approvals. A future meeting date should come from an official notice.

Read the hearing report ↗

09 / Keep up with the process

What we heard.
What happens next.

Read the project updates alongside local reporting and the official planning process.

Power agreement for Project Truckstop

Our project company and HES signed a 50 MW power agreement on September 30. It sets out a new HES substation of at least 65 MW, funded by our project company as HES makes commitments. Permits, construction and service delivery remain open.

See what the agreement covers ↗

After the public hearing

The September 28 discussion raised water use, noise, utility bills and distance from nearby homes. Some residents requested a pause.

The draft ordinance returned to Plan Review, according to Kentucky New Era. No project approval resulted from the hearing.

Read residents’ questions in local coverage ↗

The zoning review continues

The community hearing addressed the city’s proposed data-center rules. Check CDS for current documents, agendas and notices before planning to attend.

Official CDS information ↗

The two proposals, on record

The public announcement describes the existing-site conversion study and the separate proposed facility, including the substation offer.

Read the company announcement ↗

LOCAL COVERAGE

In the local news

Reporting on the proposals, city zoning review and local decisions about data centers, plus one contributed company announcement. Read the full articles at each publisher's site.

NEXT PUBLIC MEETING

No date is confirmed on this page. Check the official CDS notices ↗

10 / Other communities

What happened
in other towns?

Eight communities, with dated reports on taxes, public works, schools, housing and employee pay. Each example links to its source and states its limits. Local tax rules, utility terms and project sizes differ from Hopkinsville. Henrico County example added November 2, 2026.

HENRICO COUNTY, VIRGINIATIME / MARCH 13, 2026

A $60 million fund for affordable homes

TIME reports that Henrico County uses data center tax revenue to help qualifying first-time buyers purchase new homes. The county allocated $60 million to the fund. Its August 21 update reported 87 completed home purchases.

The $60 million is a fund allocation, not annual revenue. TIME also describes Henrico's restrictions on further data center development.

Read the TIME article ↗Read the county's August update ↗
MADISON COUNTY, MISSISSIPPICLARION LEDGER / OCTOBER 19, 2026

Projected school revenue

An October 19 Clarion Ledger report says Madison County Schools could receive about $7 million a year starting in 2028. Annual payments could rise above $33 million by 2039, after tax breaks expire. Superintendent Austin Brown says the revenue could support a career education center and higher staff pay.

These are projections, not current receipts. Early payments also help repay infrastructure debt. Final amounts depend on property assessments and the tax agreement.

Read the Clarion Ledger report on AOL ↗See Innovation Council's post ↗
WEST FELICIANA PARISH, LOUISIANAPARISH PRESIDENT / SHARED OCTOBER 20, 2026

A reported $10,000 annual raise

Parish President Kenny Havard says every parish employee received a $10,000 annual raise. In a clip shared by Innovation Council, he describes the increase as a benefit of local data center development.

This is Havard's account, shared by an advocacy group. The clip does not include payroll records or establish the funding terms. Louisiana's arrangement is separate from the Hopkinsville proposals.

Watch Havard describe the raises ↗
TAYLOR, TEXASCITY AGREEMENT / OCTOBER 8, 2026

School funding in the agreement

Taylor approved a development agreement for Taylor Technology Campus on October 8. The city lists $28.2 million in community commitments. That includes $12.7 million for school programs, student scholarships and career training. The agreement also sets rules for water use, noise and setbacks.

These are commitments for a planned campus, not payments already received or annual revenue. Texas law and the agreement's terms differ from Hopkinsville's.

Read the city's agreement overview ↗See the Data Center Wins post ↗
QUINCY, WASHINGTONSTATE REPORT / DECEMBER 2025

A larger tax base

Washington's Department of Revenue published a preliminary report in December 2025. It says added data center value helped lower Quincy's city property-tax rate. The rate fell from $3.12 per $1,000 of assessed value in 2006 to about $0.88 in 2025.

These are the report's 2025 figures. A lower tax rate does not show what any one household paid. Washington's tax system differs from Kentucky's.

Read the December state report ↗
SANDERSVILLE, GEORGIALOCAL PROJECT RESOURCE / 2025 PAYMENTS

Taxes and utility revenue

Washington County's project information site, citing city figures, reports that CleanSpark paid $2.34 million in city and county property taxes in 2025. It also reports $4.31 million in franchise fees to Sandersville. The site says those fees supported streetlights, parks and utility reserves.

These payments came from the existing operation. The proposed AI campus and its future benefits are separate. The source is a local project information site.

Read the local 2025 figures ↗
HUNTSVILLE, ALABAMASCHOOL DISTRICT / MAY 2026

Support for school STEM labs

Huntsville City Schools announced a $50,000 Meta Community Action Grant on May 15, 2026. The award supports STEM labs across all district middle schools, including equipment for robotics and engineering. The district thanked the Huntsville Data Center for its support.

The district confirms the grant award and intended use. It does not report completed purchases or student results. This is one grant, separate from local taxes.

Read the school district's announcement ↗
NEW ALBANY, OHIOCITY FINANCES / COLLECTED IN 2025

Payments for public improvements

New Albany reports that data center projects generated about $10 million in community development charges for tax year 2024, collected in 2025. The city says part of this revenue pays infrastructure debt. The remainder supports public amenities, including parks and municipal facilities.

This is one revenue stream. New Albany also uses property-tax abatements with minimum annual payment agreements. Those terms are specific to Ohio.

Read the city's financial explanation ↗

MORE STORIES TO CHECK

Follow the sources

The Innovation Council's Quincy video and these two X accounts collect community stories. They are advocacy sources. Verify a figure against local records before relying on it.

11 / Stay in the conversation

Let’s talk
about it.

Have a question about the plans? A concern about your neighborhood? An idea for local work or training? Send us a note.

Tom MasieroHopkinsville project contact
hoptown@darkhorse.inc

Email reaches the Hoptown project mailbox. It does not replace comments submitted to a public body.

Send the Hoptown team a question

Use this form or email hoptown@darkhorse.inc.

FormSubmit sends the message to our Hoptown mailbox. Its spam check can ask you to confirm you are human. Please leave out financial details and other sensitive information.

About your information

FormSubmit processes web form messages and sends them to hoptown@darkhorse.inc. Its service retains submissions for up to 30 days. You can email us instead. We use messages to respond and follow up. We may summarize common questions without names. Email us to ask about your information or request deletion, subject to recordkeeping requirements. Replit, our current host, adds a site analytics script to the public page. We do not use this page for advertising.